Align the cabinet chassis over the holes, carefully feeding the underground conduits into the designated bottom entry cutouts. Step 3: Leveling and Fastening
Before unboxing the equipment, ensure the installation site meets all structural and electrical criteria. Floor Preparation The finished floor must be perfectly level within across the entire lane footprint.
Gunnebo SpeedStile FL is more than just a security gate; it is a sophisticated marriage of precision engineering and architectural minimalism
All external inputs route directly to the main terminal board in the Master cabinet: gunnebo speedstile fl installation manual
: Minimum concrete base dimensions are typically deep, depending on the cabinet length.
Route the AC power cable into the master cabinet's power supply unit (PSU).
: Minimum dimensions of 2000mm x 500mm x 150mm deep are recommended. Cabling & Conduits : Align the cabinet chassis over the holes, carefully
Gunnebo SpeedStile FL Installation Manual: The Complete Integration Guide
Solution: Re-torque the glass clamps and initiate a system reset via the main board button.
The you are integrating with
Sign off only when:
The finished floor must be perfectly level within